![](https://static.wixstatic.com/media/0aa345_369a0566d78f473aaa4fc629a1ac846d~mv2.jpg/v1/fill/w_1920,h_1080,al_c,q_90,usm_0.66_1.00_0.01,enc_avif,quality_auto/0aa345_369a0566d78f473aaa4fc629a1ac846d~mv2.jpg)
![IMG_9096.jpg](https://static.wixstatic.com/media/0aa345_fce46dde683e446eb8ba0157785be176~mv2.jpg/v1/fill/w_440,h_365,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_9096.jpg)
YZ Systems, Aircomm
Figure 8 installation for YZ Systems is carried out with precision and attention to detail. We work closely with you to understand your specific requirements and tailor our services to meet your needs.
From the initial fitting of the profile system to the final commissioning of the installation, we handle every step of the process. Our experienced technicians have the knowledge and expertise to deliver outstanding results, ensuring that your Figure 8 installation is completed to the highest standards.
Kilroot Power Station
SGMM Ltd, we understand the importance of efficient and timely project completion.
In just two weeks, we successfully transformed the system from no gas to full gas, ensuring that all functionality checks were performed meticulously. Additionally, we conducted thorough filter checks and PSSR checks to guarantee the safety and reliability of the AGI.
Our team of experienced professionals is dedicated to delivering exceptional results and exceeding client expectations. We take pride in our commitment to providing high-quality commissioning services that are tailored to meet your specific requirements.
![cb060189-dcd0-4800-88fb-9ac541ac0a11.JPG](https://static.wixstatic.com/media/0aa345_9c0b82be4623449aa2abca4850c20340~mv2.jpg/v1/fill/w_498,h_373,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/cb060189-dcd0-4800-88fb-9ac541ac0a11_JPG.jpg)
![IMG_2226.jpg](https://static.wixstatic.com/media/0aa345_318f87b1e1744d3da4faa83f957ab630~mv2.jpg/v1/fill/w_472,h_266,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_2226.jpg)
Loughborough University
Loughborough University engaged our services to conduct annual functional inspections and perform a comprehensive overhaul of their independent gas network. Our objective is to ensure the network operates safely and efficiently.
​
SGMM Cover a 24/7 emergency call out for this contract
![](https://static.wixstatic.com/media/0aa345_8db0922278814954bce18e39599baa76~mv2.jpg/v1/fill/w_115,h_205,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/0aa345_8db0922278814954bce18e39599baa76~mv2.jpg)
![](https://static.wixstatic.com/media/0aa345_e09917843e864e308d5e5178b0354795~mv2.jpg/v1/fill/w_115,h_205,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/0aa345_e09917843e864e308d5e5178b0354795~mv2.jpg)
![](https://static.wixstatic.com/media/0aa345_a407d233f9bd48e19a1580ef63fc0fae~mv2.jpg/v1/fill/w_83,h_147,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/0aa345_a407d233f9bd48e19a1580ef63fc0fae~mv2.jpg)
Ministry Of Defence
SFG 1120 – 06 GAS COMPLIANCE​
SGMM completes the functional inspection on the metering installation
​
Tightness testing of the metering installation and outlet pipe work for the clients gas certification
​
​